Renovation of the stair landings and the carpets of the stairways will continue at Joensuu Campus
Library.
The work will start from the 3rd floor’s stair landing on week 41 (10.10.2022-), and the actual demolition work will start on week 42 (17.10.2022-). Demolition that causes heavy noise will be scheduled between 6am and 11am. We will inform about the progress of the maintenance separately.
The maintenance will affect library use on following ways:
- Every hall at the library can be entered
- Library’s lockers on the 3rd floors stair landings will be temporarily moved to the halls 3A and 3B.
We are sorry for the inconvenience!